Pwd Schedule Of Rates 2018-19 Karnataka Pdf Jun 2026

Is this document required for an or a private estimation project? Share public link

Every item rate in the SR is backed by a "Data Sheet" or "Rate Analysis." This breaks down exactly how much material, labor time, and machinery time is required to produce one unit (e.g., 1 cubic meter of concrete).

Daily wages for skilled, semi-skilled, and unskilled labor.

Every task has a unique alphanumeric code in the PDF (e.g., item codes for excavation or RCC work). pwd schedule of rates 2018-19 karnataka pdf

Fluctuation in diesel prices directly impacted the carriage charges and the operation cost of heavy machinery like excavators, rollers, and concrete mixers. How to Read and Use the PDF Document

If construction materials must be hauled from a quarry further than the standard distance (usually 5 km), extra "lead charges" per kilometer are calculated and added using the tables provided in the general notes.

: Minimum wages were updated based on the state's annual average CP index for industrial workers. Operational Overheads : A standard 10% overhead charge 10% contractor's profit Is this document required for an or a

Hourly or daily charges for utilizing heavy machinery such as excavators, road rollers, concrete mixers, and tippers. Why the 2018-19 SR Remains Relevant

Rates for excavation, concrete work, masonry, flooring, and painting.

| Item Code | Description | Unit | Rate 2018-19 (₹) | | :--- | :--- | :--- | :--- | | 101 | Earthwork excavation in ordinary soil | cum | 180.00 | | 804 | Providing and laying reinforced cement concrete (M20 grade) | cum | 5,250.00 | | 1201 | Plastering with cement mortar (1:6) – 12mm thick | sqm | 98.00 | | 2531 | Providing vitrified tiles (Flooring) | sqm | 520.00 | Every task has a unique alphanumeric code in the PDF (e

: Covers skilled and unskilled labor. In the 2018-19 revision, labor charges were generally increased by 10% compared to previous years.

Do you need assistance with for a specific item (like concrete or earthwork) from this specific year?

Provides data on rates for materials like cement, steel, sand, aggregate, bricks, wood, and paint. The Karnataka PWD Schedule of Rates 2018-19 | PDF indicates specific rates for items like Bitumen 30/40 grade (≈ ₹39,275 per Tonne) and CRMB 55 (≈ ₹39,850 per Tonne) during that period.

: Use of Manufactured Sand (M-Sand) was actively encouraged over river sand to meet environmental guidelines. Typical Rates for Construction Materials (2018-19) Material Item Rate (Approx. ₹) Cement (43 Grade) Reinforcement Steel Manufactured Sand (M-Sand) Cubic Meter Coarse Aggregate (20mm) Cubic Meter Burnt Bricks (1000 Nos) Bitumen (80/100 Grade)