Completed for Exhaust System EF-04. Result: Passed within SMACNA allowable limits. 6. CRITICAL CHALLENGES & RESOLUTION PLAN Area / System Description of Issue Impact on Project Action Plan / Resolution Floor 7 North Civil blockwork delayed; MEP teams cannot run conduit. 4-day delay to electrical first-fix. Civil contractor to accelerate wall handover by June 04. Electrical Room Water seepage observed through basement external wall. Risks delay to switchgear positioning. Inject PU grout waterproofing membrane immediately. 7. TWO-WEEK LOOK-AHEAD TARGETS Position and anchor the main chillers on the roof dunnage. Complete first-fix plumbing rough-ins up to Floor 8.
Completed for Chilled Water piping lines on Floors 1–4. Witnessed and signed off by the Consultant Lead Engineer.
Coordination clash between HVAC large-size duct and Fire Fighting main pipe on Floor 7 Corridor Grid B-C. Impact: Work halted locally at Grid B-C. mep work progress report sample
: "During Week 23, the MEP team achieved a green status overall. Key accomplishments include the completion of chilled water piping on Level 4 and the successful pressure testing of firefighting mains on Levels 1-3. A potential issue (amber) has been identified with the delivery of electrical cable trays for Level 5, which is being escalated with the procurement team to avoid a schedule impact."
Overall project health for this period was 🟢 GREEN . The primary focus was on MEP rough-ins for Levels 7 and 8. Chilled water piping on Level 7 was completed one day ahead of schedule, allowing mechanical teams to mobilize to Level 8 early. A potential issue (🔴 RED) has been identified with the main electrical cable delivery, which is now confirmed to be two weeks late. A mitigation plan is in place to re-sequence activities. Completed for Exhaust System EF-04
A visual or tabular representation comparing against Actual % Complete . This highlights whether the MEP contractor is ahead of, or lagging behind, the master construction schedule. 3. Discipline-Wise Progress Breakdown
| Issue ID | Description | Impact | Action / Resolution | Responsible Party | Target Date | |----------|-------------|--------|----------------------|--------------------|--------------| | MEP-01 | VFD panel delivery delay | May delay fan startup | Expediting shipment; using temporary VFD for testing | Supplier / PM | April 18 | | MEP-02 | Structural clash on floor 4 plumbing line | 3-day delay | Revised routing approved; rework started April 11 | MEP Subcontractor | April 14 | CRITICAL CHALLENGES & RESOLUTION PLAN Area / System
MEP works are highly interdependent. Highlight if electrical work is delayed due to HVAC ducting issues. Color Code: